Trail Construction - water management fix 
293-9356
293-9356

with the step taken off, is an easy ride up
with the step taken off, is an easy ride up

these will be reused in the trail construction
these will be reused in the trail construction

293-9360
293-9360

bad pic of the ride up ramp just after rock garden.
bad pic of the ride up ramp just after rock garden.

pebbles are pounded and mixed into the mud.
pebbles are pounded and mixed into the mud.

flow line totally done up. pebbles are transported in sacks and hand carried in.
flow line totally done up. pebbles are transported in sacks and hand carried in.

this is NOT what we should be doing. never fill the trail with loose pebbles, we learn from it and luckily only the first 10m of the trail is done up this way
this is NOT what we should be doing. never fill the trail with loose pebbles, we learn from it and luckily only the first 10m of the trail is done up this way

compare this with the previous series of photo of the same section, a mudpie turn into properly done up drainage. the lining on the right is to prevent further mud sliding into the trail. We reuse the fallen trunks around the area
compare this with the previous series of photo of the same section, a mudpie turn into properly done up drainage. the lining on the right is to prevent further mud sliding into the trail. We reuse the fallen trunks around the area

bad pic of the lining.
bad pic of the lining.

to put everyone into perspective, this is how big this water drainage is
to put everyone into perspective, this is how big this water drainage is

293-9368
293-9368

diagonally cut drain on the down slope followed by a 2 feet wide drain section
diagonally cut drain on the down slope followed by a 2 feet wide drain section

this line is totally ridable now, the mud is a problem of the past
this line is totally ridable now, the mud is a problem of the past

bad pic of the drain dug up
bad pic of the drain dug up