Park Construction - pre armor 
sunken rattan. to be armored later on
sunken rattan. to be armored later on *

the joint at the end of the option. left being the long downslope
the joint at the end of the option. left being the long downslope *

two lines were cut, and many more later on, the one on the left bring the ride to a hairy dropoff and a turn. the one of the right of the big tree send rider down a long muddy slope. We carve the right option eventually
two lines were cut, and many more later on, the one on the left bring the ride to a hairy dropoff and a turn. the one of the right of the big tree send rider down a long muddy slope. We carve the right option eventually *

the LEFT dropoff option, full of mud, tree obstacle
the LEFT dropoff option, full of mud, tree obstacle *

the direct line towards the big rock, soon to be made into a S-bend to smoothen the flow
the direct line towards the big rock, soon to be made into a S-bend to smoothen the flow *

the initial descent, taken from below
the initial descent, taken from below *

the right bank after the 'S-bend', the left option will be developed into a newbie line later on
the right bank after the 'S-bend', the left option will be developed into a newbie line later on *

293-9326
293-9326 *

the drain crossing, before any bridging is done
the drain crossing, before any bridging is done *

* Comments available for this item.
Powered by Gallery v1 RSS